Showing posts with label nausicaa shawl. Show all posts
Showing posts with label nausicaa shawl. Show all posts

Sunday, March 7, 2010

A Cure for the Rut

So, a few posts ago I made reference to a shawl that I had started in an attempt to get out of the knitting rut that I found myself mired in. Amusingly enough, knitting the shawl wasn't really as enjoyable as I had hoped it would be. I kept angsting about whether or not I liked the way that the stripes looked, and when you're unsure about whether a project is working, it takes away some of the joy of making it. The fact that the last few rows of triangle shawls last forever didn't really aid matters. Still, I'm happy to say that I'm actually really pleased with how it turned out:



And this is: A basic triangle shawl with stripes of 'Sundara Sock' (100% wool) in 'Brambleberry' and some black Patonyle (wool/nylon blend), knitted on a 3.75mm circular needle.

Anna says: As previously mentioned, this project basically revolved around my desire to finally use the Sundara yarn, and use it in a project that wasn't socks - the colour was far too beautiful to be subjected to the ravages of my feet. There wasn't really enough of it for a garment, or to make a decent length scarf, so a shawl it was.

For all those interested, my process went roughly as follows (this is a basic triangle shawl, and about as basic as you can get, but writing this out makes me feel important and knowledgeable!):

Cast on 7 stitches.
Row 1 (RS): k1, m1, k2, m1, k1, m1, k2, m1, k1 (4 stitches increased, 11 stitches total)
Row 2: Knit all stitches
Row 3: k3, place marker, m1, k2, m1, place marker, k1, place marker, m1, k2, m1, place marker, k3
Row 4: Knit all stitches

From this point, work as follows: On every RS row, knit first 3 stitches, slip marker, m1, knit to next marker, m1, slip marker, k1 (this is the centre stitch), slip marker, m1, knit to last marker, m1, slip marker, k3. On every wrong side row, k3, purl to last 3 stitches, k3. Basically you are increasing 4 stitches per right side row - once on each edge, next to the garter stitch edge, and once on either side of the centre stitch. Continue on until your shawl reaches the desired size.

My stripe pattern went as follows (MC being Sundara, CC being the Patonyle):
4 rows CC, 4 rows MC (72 rows, 18 stripes, ending with MC)
2 rows CC, 4 rows MC (30 rows, 10 stripes, ending with MC)
2 rows CC, 6 rows MC (18 rows, 5 stripes - end with an extra 2 row stripe of CC)
16 rows MC
4 rows MC in garter stitch (maintaining increases).
Bind off all stitches.




As previously mentioned, I really wasn't wild about the striping while I was knitting the shawl. But now I've decided that I quite like the way that it turned out. And while it's smaller than most of the other shawls that I own, it's still just large enough to wear in a couple of different ways (as a scarf, knotted around the shoulders, as a shrug with the ends tied behind the back, etc). And I finally managed to get that Sundara knitted up and out of my stash! This was a classic case of a yarn that just felt 'too nice to use'. Which is arguably a state that no crafting material should ever reach. At least I've found this skein a good home.




In other news, I am making good progress on my cabled Cybele vest. I've survived my first week of the new course, and I am actually really liking it so far! This week I ate my body weight in delicious home-made museli. Oh, and I forgot to mention this earlier: last week I went and saw Amanda Palmer play at The Forum, and it was awesome! I even survived the crazy rain/hail that Melbourne weathered yesterday. The flooding was pretty nuts though - the underpass next door to my work flooded so deeply that the cars that got stuck under there were fully submerged, to the point that they weren't even visible. This situation wasn't made better by the fact that people kept trying to drive through... *rolls eyes*

So yes, I have officially survived the first week of uni, flash flooding, and death by museli. Let's see what next week brings...

Thursday, February 11, 2010

In a knitting rut...

It is currently raining here in Melbourne - the heat wave of the last few days has finally broken, which is very good because now I can go into the city and get things done without running the risk of roasting to death in public transport hell. Doing things will be good, if I can make it happen, because once again, I have fallen into the void between semesters: that glorious place where I have free time, but have so much that I want/have to do with it that I end up not getting much done at all. Such is life I suppose. I have been doing things - I've been working a fair bit, getting some writing done, sewing, cooking, and organising university things - but doing a little bit of many things never makes you feel quite so satisfied as doing a lot of one thing. I suppose I shouldn't feel too bad - my brother has just been playing computer games for about 12 hours per day. So, stuff I've been up to:




As I mentioned, I've done a lot of cooking. I've been making huge vats of tabbouleh, or my version of it (a slightly higher ratio of grains to herbs so that it's filling enough to take to work and have as a complete meal). Yesterday I also made a version of these, and yes, they are as terrifying in real life as they look/sound on that site. I made a half batch, and made a basic butter cake base instead of the brownie base they suggested (because I was quite convinced that a brownie base would probably catapult this slice into the realm of too-rich-to-actually-be-enjoyable), and they're still deadly. Nice, but deadly.



I went to a wedding on the weekend (very enjoyable!) and managed to make the bride and groom a card that involved love hearts but didn't make me want to vomit. I was proud of that... It's a little abstract, but I was happy with it.




And I've been knitting. Though not as much as I usually like to. I've sort of snagged on the two projects I've been working on - one of them (the summer top I mentioned in the last entry) is having issues with drape, and it's knit at such a small gauge that it takes a long time to make any progress, so the idea of proceeding only to have to rip back is not appealing. And the other is knit in bulky weight wool that is not particularly suited to summer knitting. The fact that they are both my own designs doesn't really help things either - when proceeding with a project means having to sit down and make calculations, or thread things on and off of waste yarn so that you can try them on, it just makes it a little harder to motivate yourself to keep going. I know that this is a problem that most people face, so I really have no right to whinge, but yeah, there you go.

At any rate, I was still wanting to knit, even though I wasn't too keen on my works-in-progress, so I started the above piece. A basic, top down, triangular shawl - a nice and easy project that I didn't have to think about, and can knit while chilling out and chatting, or listening to music. I am using my long-hoarded Sundara Sock yarn (in 'Brambleberry'), and to make it go further I'm striping it with some basic black fingering weight yarn (I really liked the Sundara, but didn't think I had enough of it to make a decent size shawl using it alone). So hopefully this will be the nice gentle project I need to get my knitting momentum back. I'm sure the lull won't last for long...